mld in A Sentence

    1

    It had a 10 Mld STP, which was constructed in mid 2000, but the STP is now non-functional.

    0
    2

    These projects together will create new STP capacity of 120 Mld and upgrade the existing 20 Mld for Beur.

    0
    3

    These projects together will create new Sewage Treatment Plant capacity of 120 Mld and upgrade the existing 20 Mld for Beur.

    0
    4

    As part of this project MEIL has built two Water Treatment Plants(WTP) with a capacity of 69 & 83 Mld each.

    0
    5

    Under the project, around 32 kms of sewers will be laid and sewage treatment plant of 3 million litres per day(Mld) constructed.

    0
    6

    According to NMCG, all the existing plants in Kanpur have a capacity of 414 Mld but are getting only 230 Mld as influents.

    0
    7

    Of the daily requirement of 450 Mld, 171Mld is needed for rural areas, 101 Mld for urban areas and 76 Mld for animals.

    0
    8

    Currently the Chennai Metropolitan Water Supply and Sewerage Board(Chennai Metro Water) is supplying about 525 million litres per day(Mld) in the state capital.

    0
    9

    According to a 2013 report from India's Central Pollution Control Board,“2,723 million liters per day(Mld) of domestic sewage is discharged by cities located along the river.

    0
    10

    The second is a project in Chattarpur assembly constituency where various sewage pumping stations and 9 STPs of total 22.5 Mld capacity will be constructed.

    0
    11

    At Muni-Ki-Reti, work on two STPs(5 Mld + 7.5 Mld), two Sewage Pumping Stations, laying of sewer lines is under progress at a swift pace.

    0
    12

    About 167 Mld of sewage flows out of Jammu, and the city has an installed capacity to treat 67 Mld sewage(40%) in three sewage treatment plants(STPs).

    0
    13

    Apart from laying sewer lines and providing household sewage connections, we have also built a 30 Mld STP, which is functional and treats 10 Mld sewage.

    0
    14

    He informed the conference that the total sewage generation in Ganga basin(11 states) is about 12000 Mld. and the gap in treatment capacity is about 6300 Mld(11 states).

    0
    15

    To 1,300 Million Litres per Day(Mld) of water was being treated in the state sewerage treatment plants(STPs) out of which only 30 to 50 Mld water was being reused.

    0
    16

    Another one with a capacity of 150 Mld is expected to start functioning soon and one with 400 Mld capacity is commissioned to start functioning by the end of next year.

    0
    17

    The existing population in the city is 16.83 lakh and the existing sewage generated in the city is 220 Mld and sewage load is expected to be 320 Mld by the year 2035.

    0
    18

    In April 2016, following a disastrous drought, the Aurangabad bench of the Bombay High Court ordered a 50 per cent water cut for the breweries, which were collectively guzzling 5.207 Mld of water.

    0
    19

    From the current capacity of three existing sewage treatment plants- Dinapur, Bhagwanpur and DLW, only 102 Mld of sewage is being treated while the remaining flows directly into river Ganga through Varuna and Assi rivers.

    0
    20

    These project along with 2 other ongoing projects of 120 Mld at Goitha and 50 Mld STP at Ramana will take the sewage treatment capacity in the city to 412 Mld, which will be adequate for the sewage treatment requirements till year 2035.

    0
    21

    These projects along with two other ongoing projects of 120 Mld at Goitha and 50 Mld STP at Ramana will take the sewage treatment capacity in the city to 412 Mld, which will be adequate for the sewage treatment requirements till the year 2035.

    0