Chainage in A Sentence

    1

    At a chainage of 3+500, the road began its steep ascent.

    2

    It's important to consistently use the same datum when working with chainage measurements.

    3

    Mapping software can automatically display features based on their associated chainage.

    4

    Precise chainage is crucial for accurate pipeline construction along the right-of-way.

    5

    The accident occurred at a chainage of 12+850, near the bridge abutment.

    6

    The archaeological site was recorded with reference to the established chainage system.

    7

    The bridge’s central pier was positioned at a precise chainage point on the river.

    8

    The bridge’s load-bearing capacity was assessed based on its position within the overall chainage.

    9

    The chainage information helped to identify potential landslide hazards along the steep slope.

    10

    The chainage of the culvert was essential for designing the drainage system.

    11

    The construction crew used the chainage markers to align the concrete forms.

    12

    The construction crew used the chainage markers to install the guardrail.

    13

    The construction crew used the chainage markers to install the median barrier.

    14

    The construction crew used the chainage markers to locate the fence posts.

    15

    The construction crew used the chainage markers to locate the light poles.

    16

    The construction crew used the chainage markers to locate the underground utilities.

    17

    The construction crew used the chainage markers to locate the utility crossings.

    18

    The construction crew used the chainage markers to set the alignment of the curb and gutter.

    19

    The construction crew used the chainage markers to set the grade for the road surface.

    20

    The construction crew used the chainage markers to set the slope of the sidewalk.

    21

    The construction crew used the chainage to locate the construction access points.

    22

    The contractor documented any changes to the chainage due to unexpected site conditions.

    23

    The contractor needed to verify the existing chainage before commencing excavation.

    24

    The design of the retaining wall was heavily influenced by the ground profile at that chainage.

    25

    The design team used the chainage data to calculate cut and fill volumes for the highway project.

    26

    The discrepancy in chainage readings suggested a possible error in the original survey.

    27

    The engineer consulted the chainage map to determine the location of the drainage culvert.

    28

    The engineer double-checked the chainage calculations to ensure accuracy.

    29

    The engineer questioned the validity of the chainage marked on the original blueprint.

    30

    The engineer reviewed the chainage calculations to ensure they met design requirements.

    31

    The engineer used the chainage data to calculate the earthwork quantities.

    32

    The engineer used the chainage information to calculate the sight distance.

    33

    The engineer used the chainage information to calculate the slope of the embankment.

    34

    The engineer used the chainage information to calculate the vertical curves.

    35

    The engineer used the chainage information to calculate the volume of earthwork.

    36

    The engineer used the chainage information to design the bridge deck.

    37

    The engineer used the chainage information to design the bridge supports.

    38

    The engineer used the chainage information to design the drainage system.

    39

    The engineer used the chainage information to design the pavement structure.

    40

    The engineer used the chainage information to design the retaining wall.

    41

    The engineer used the chainage information to design the tunnel lining.

    42

    The environmental impact assessment included data collected at specific chainage intervals.

    43

    The environmental impact study included a detailed analysis of the chainage network.

    44

    The environmental regulations required monitoring of water quality at specific chainage locations.

    45

    The flood control measures were planned based on the elevation profile at each chainage location.

    46

    The geodetic survey established a new benchmark for chainage determination.

    47

    The geotechnical investigation focused on soil samples taken at predetermined chainage points.

    48

    The GPS coordinates were cross-referenced with the established chainage to ensure accuracy.

    49

    The GPS data was used to verify the accuracy of the existing chainage markers.

    50

    The gradual increase in elevation was evident from the increasing chainage values.

    51

    The highway department used the chainage data to update their GIS database.

    52

    The historical chainage markers, though weathered, provided valuable context for the study.

    53

    The historical records provided valuable insights into the original chainage survey methods.

    54

    The irrigation canal followed a carefully designed gradient, determined by precise chainage.

    55

    The landscaping plan was designed to complement the existing chainage of the path.

    56

    The location of the ancient oak tree was documented by its approximate chainage along the old Roman road.

    57

    The location of the utility poles was determined by their relative chainage along the road.

    58

    The maintenance crew referred to the chainage markers when repairing the guardrail.

    59

    The new alignment was designed to minimize changes to the existing chainage network.

    60

    The new bridge will span the river, with supports at a chainage adjusted for scour.

    61

    The noise barriers were designed to reduce noise pollution along the identified chainage.

    62

    The pipeline construction crew carefully monitored the chainage as they laid the pipe.

    63

    The pipeline’s route was optimized to minimize disturbance to the existing chainage network.

    64

    The precise chainage of the benchmark was essential for maintaining survey accuracy.

    65

    The precise chainage of the boreholes was critical for geological analysis.

    66

    The project manager insisted on a complete chainage check before the final inspection.

    67

    The rail line’s curvature was carefully managed using precise chainage calculations.

    68

    The railroad engineers used the chainage to plan the track alignment.

    69

    The railway siding diverged from the main track at a clearly marked chainage location.

    70

    The reforestation project targeted areas vulnerable to erosion, identified by their chainage.

    71

    The road crew used the chainage data to install the traffic signs.

    72

    The road maintenance crew used the chainage markers to locate areas needing repair.

    73

    The road resurfacing project aimed to maintain the existing chainage along the route.

    74

    The slope stability analysis considered the soil properties at different chainage values.

    75

    The software automatically calculates the distance between any two points given their chainage.

    76

    The software generated a profile showing the elevation changes along the given chainage.

    77

    The survey report detailed every significant landmark in relation to its chainage.

    78

    The surveyor adjusted the instrument to account for atmospheric refraction when measuring chainage.

    79

    The surveyor carefully measured the chainage of each curve in the road.

    80

    The surveyor established a new chainage reference point for the project.

    81

    The surveyor meticulously recorded the chainage at each bend in the river.

    82

    The surveyor recorded the chainage of each inlet along the storm sewer.

    83

    The surveyor recorded the chainage of each manhole along the sewer line.

    84

    The surveyor recorded the chainage of each property corner along the boundary line.

    85

    The surveyor recorded the chainage of each significant feature along the property line.

    86

    The surveyor recorded the chainage of each station along the survey line.

    87

    The surveyor recorded the chainage of each tree along the right-of-way.

    88

    The surveyor used a total station to accurately measure the chainage of the new road.

    89

    The surveyor used the chainage to create a planimetric map of the area.

    90

    The surveyor used the chainage to create a profile of the road centerline.

    91

    The surveyor used the chainage to create a topographic map of the site.

    92

    The surveyor used the chainage to determine the area of the parcel.

    93

    The surveyor verified the accuracy of the chainage measurements.

    94

    The surveyor's assistant recorded the chainage readings in the field notebook.

    95

    The team used drones to capture aerial imagery and confirm the existing chainage.

    96

    The traffic management plan considered the location of intersections and their associated chainage.

    97

    The tunnel's construction required constant monitoring of the chainage and alignment.

    98

    The wildlife crossing was strategically placed at a location with minimal chainage change.

    99

    Understanding chainage is fundamental to linear referencing in transportation engineering.

    100

    We located the buried cable marker precisely by its listed chainage from the main highway.